Applied Materials (AMAT) July 2019-Present
|
At AMAT, my title is a Customer Engineer. My main customer site is Northrop Grumman in Linthicum Maryland.
- Working directly with customers on electromechanical Metrology and process tools for use of equipment, general maintenance, and problem solving
- Evaluate and diagnose problems with co-workers, customer, and field support in isolating and solving problems on equipment to make appropriate repairs
- Performing administrative and coordination duties, including pass-downs, work orders, field service reports, system problem reports, and guides for other employees to use
- Restructured local team’s cloud storage system to make it more efficiently and organized for ease of use.
- Led local team in office reorganization to create a better work environment and find parts in storage more efficiently
- Creating procedures for local team to reference to when trying to work on certain tasks
- Onboarding new employees on IT with server navigation and equipment usage
- Working with Microsoft Hololens to create easier ways for employees to receive troubleshooting assistance from support teams
Engineering Design Technologies (EDT) January 2017-May 2019
|
At EDT, my title is an Engineering Intern. The division of EDT I work for is the Geo-Environmental Engineering sector.
- Using AutoCAD, completed pipeline plans and Cathodic Protection designs.
- Visited work sites to collect soil samples, completed lab testing for soil sulfates, chlorides, resistivity levels, and other characteristics.
- Used Google Earth to layout pipelines and setup locations for soil sampling and Cathodic Protection testing.
- Working directly with engineers and field technicians to meet project deadlines.
- Assisted with drone technology for projects with Anne Arundel County.
- Data and Project management using Microsoft Excel.
- Trained new Interns.
- Assisted in gathering GIS data for pipelines.
- Written traffic control plans for Gas Station drilling.
Project Experience:
Anne Arundel County Contract Sewer Main
Main Street, Deale, MD – SPS FM Rehab
Provided site pictures using a drone and stitched all the pictures together. Conducted laboratory analysis of soil from the site. Assisted in setting up the data loggers to track soil resistivity levels and made graphs of the results.
Dulles Corridor Metrorail Project, Dulles VA
Client: Piping & Corrosion Specialties, Inc.
Revised and edited multiple older CAD files for the cathodic protection systems for the Dulles Corridor Metrorail Project and multiple other projects.
66-inch Steel Main Project, Washington DC
Provided CAD files of the layout of the pipeline, with proposed plans of how to improve the pipeline and protect it from further harm using anodes. Went on site and tested certain components of the pipeline to make sure it is still salvageable.
Towson East 42” and 48” Survey, Towson MD
Provided google earth images of the pipeline with testing locations of resistivity tests I assisted in.
North Area Main Improvement, Atlanta GA
Provided CAD files of the layout of the pipeline, with sections labeled if they passed certain tests or not.
Gwynn Falls Survey, Baltimore MD
Went on site, assisted in setting up data loggers to track soil resistivity levels. Also conducted laboratory analysis of soil from the site. Provided google earth images of the pipeline with all the testing locations.
Brown & Caldwell-WSSC-Forest Heights
Went on site, assisted in setting up data loggers to track soil resistivity levels. Also conducted laboratory analysis of soil from the site. Provided google earth images of the pipeline with all the testing locations.
Anne Arundel County Contract Sewer Main
Main Street, Deale, MD – SPS FM Rehab
Provided site pictures using a drone and stitched all the pictures together. Conducted laboratory analysis of soil from the site. Assisted in setting up the data loggers to track soil resistivity levels and made graphs of the results.
Dulles Corridor Metrorail Project, Dulles VA
Client: Piping & Corrosion Specialties, Inc.
Revised and edited multiple older CAD files for the cathodic protection systems for the Dulles Corridor Metrorail Project and multiple other projects.
66-inch Steel Main Project, Washington DC
Provided CAD files of the layout of the pipeline, with proposed plans of how to improve the pipeline and protect it from further harm using anodes. Went on site and tested certain components of the pipeline to make sure it is still salvageable.
Towson East 42” and 48” Survey, Towson MD
Provided google earth images of the pipeline with testing locations of resistivity tests I assisted in.
North Area Main Improvement, Atlanta GA
Provided CAD files of the layout of the pipeline, with sections labeled if they passed certain tests or not.
Gwynn Falls Survey, Baltimore MD
Went on site, assisted in setting up data loggers to track soil resistivity levels. Also conducted laboratory analysis of soil from the site. Provided google earth images of the pipeline with all the testing locations.
Brown & Caldwell-WSSC-Forest Heights
Went on site, assisted in setting up data loggers to track soil resistivity levels. Also conducted laboratory analysis of soil from the site. Provided google earth images of the pipeline with all the testing locations.